top of page

Bathroom Renovation Permit Vancouver: 2025 Requirements, Costs & Risks

  • Writer: Alex Alex
    Alex Alex
  • Jul 16
  • 10 min read

Planning a bathroom renovation in Vancouver? Getting the right permits from the City of Vancouver in Vancouver BC, isn’t just paperwork – it protects you from fines, insurance headaches, and safety hazards. With Vancouver’s updated 2025 regulations and mandatory digital submission process, understanding permit requirements matters more than ever.

This guide covers everything you need to know about securing a bathroom renovation permit in Vancouver, from when you need permits to navigating the new City of Vancouver – Home, Property & Development page. Whether you’re doing minor cosmetic updates or a full bathroom overhaul, this step-by-step guide helps you comply with city regulations and avoid project delays.

Modern bathroom renovation in Vancouver featuring a freestanding tub, floating vanity, and walk-in shower with skyline overlay
Modern bathroom renovation in Vancouver featuring a sleek freestanding tub, elegant floating vanity, and a spacious walk-in shower, enhanced by a stylish skyline overlay.

Key Points

Most bathroom renovations in Vancouver require permits, especially for plumbing, electrical, or structural changes. The city enforces compliance through a digital system, and the permit process has changed for 2025.

Here are the facts about Vancouver bathroom renovation permits:

  • Building permits cost $300-$1,500, plus plumbing permits ($100-$300) and structural permits ($200-$400).

  • Permit approval takes 2-4 weeks for simple renovations, longer for complex ones.

  • Since 2025, you must submit all permit applications through Vancouver’s ePlan portal.

  • Working without required permits can lead to fines from $500-$10,000, project stoppage, and insurance complications.

  • New seismic and adaptable dwelling compliance requirements took effect March 10, 2025.

  • You often need multiple permits for full bathroom renovations.


When Do You Need a Bathroom Renovation Permit in Vancouver?

Whether you need a bathroom renovation permit depends on your project’s scope and nature. Understanding these requirements helps you avoid delays and ensures your renovation meets safety standards.

When determining permit requirements for bathroom renovations, consider land use and zoning regulations, as they affect what you can do.

Scenarios That Require Permits

Moving or Installing New Plumbing Fixtures: You’ll need a plumbing permit if you move a toilet, bathtub, or sink. This includes changing the bathroom layout or swapping fixture positions, which affects existing plumbing lines and drainage systems.

Electrical Work: Installing new outlets, lighting fixtures, ventilation fans, or GFCI outlets near water sources requires electrical permits. Even if you do electrical work yourself, you must get permits and inspections to meet the BC Building Code.

Structural Modifications: You must get a building permit if you remove walls, move walls, create new openings, enlarge windows, or modify doors. This applies whether you’re working with interior walls or making changes that affect the building’s load-bearing elements.

Waterproofing System Modifications: If you change waterproofing systems or modify the building envelope, you must obtain the required permits. The 2025 codes require tougher standards to prevent water damage and mold.

Layout Changes: Changing your bathroom’s layout usually means you need building, plumbing, and possibly electrical permits, as these changes affect multiple building systems.

Work That Doesn’t Require Permits

You don’t need permits for cosmetic updates like painting, tiling over existing surfaces, or replacing fixtures in the same location unless these affect structural, plumbing, or electrical systems. Simple cabinet replacement or hardware updates also don’t require permits.


Types of Permits for Bathroom Renovations

Knowing the different permit types helps you figure out which approvals your renovation requires and budget for permit costs.

Building Permit

You’ll need a building permit for any major changes, such as removing load-bearing or non-load-bearing walls, enlarging or creating new windows, or changing the building envelope. Building permits ensure your renovation meets Vancouver building bylaw requirements and keeps the structure safe. All building permits must comply with the Vancouver Building By-law.

Plumbing Permit

You must get a plumbing permit when adding, relocating, or replacing plumbing fixtures like sinks, toilets, bathtubs, or showers. This includes installing new water supply lines, modifying drainage systems, and changing venting configurations. Technical Safety BC requires inspections for all plumbing work.

Electrical Permit

You need an electrical permit when installing new electrical circuits, outlets (especially GFCI near water), lighting upgrades, or ventilation fans. Electrical work must meet current electrical system standards and pass inspection before energizing new circuits.

Gas Permit

You must obtain a gas permit if you install gas-powered water heaters, in-floor heating systems, or other gas lines. Gas work requires specialized licensing and extra safety measures beyond standard renovation permits.

Most full bathroom renovations require multiple permits. Vancouver’s ePlan portal lets you manage these through a single digital application process for complex projects.

Vancouver ePlan portal for submitting bathroom renovation permits online in 2025 with building and inspection options
Online platform for submitting bathroom renovation permits in Vancouver, 2025. Manage applications and inspections easily through the ePLAN Portal.

2025 Bathroom Renovation Permit Process in Vancouver

The City of Vancouver follows a structured sequence to ensure safety and compliance with current building codes during bathroom renovation permitting. The city provides detailed information to help you comply.

Step-by-Step Application Process

1. Pre-Application Consultation: Although optional, you should schedule a consultation with the Development and Building Services Centre to clarify zoning restrictions, heritage considerations, and code requirements. This step especially helps with renovations in older buildings or unique properties.

2. Project Planning and Documentation: Prepare detailed renovation plans showing existing and proposed layouts. Your plans must clearly outline all changes to the bathroom, including fixture locations, structural modifications, and compliance with seismic and adaptable dwelling standards.

3. Digital Submission via ePlan Portal: Since 2025, you must submit all permit applications through the city’s ePlan portal. Paper applications are no longer accepted. Upload your plans, complete project information forms, and pay permit fees online.

4. Fee Payment and Processing: The system calculates permit fees automatically based on your project’s scope, complexity, and value. You’ll receive instant cost estimates for different permit types and inspections.

5. Review and Approval Timeline: Minor bathroom renovations take 2-4 weeks to approve. Complex projects involving load-bearing changes, seismic compliance, or heritage properties can take 6-12 weeks or longer.

6. Inspection Scheduling: After approval, schedule inspections at key milestones: rough-in stages, plumbing and electrical installations, waterproofing application, and final completion before occupancy.

7. Final Approval and Permit Closure: You can’t use your renovated bathroom until all inspections pass and the city closes your permit. This ensures your renovation meets safety and building requirements.


Required Documents and Plans

To get your permit approved, you must submit comprehensive documentation demonstrating compliance with Vancouver’s building standards and zoning bylaws.

Required Documents

  • Detailed Floor Plans: Submit existing and proposed floor plans showing all fixtures, walls, windows, and doors with dimensions. Show the project’s scope and any changes to the existing commercial space or residential layout.

  • Property Ownership Proof: Provide a current land title or recent property tax assessment to verify ownership and property details.

  • Professional Drawings: For major renovations or load-bearing work, have registered architects, engineers, or designers prepare drawings. These ensure compliance with technical and safety standards.

  • Environmental Assessments: Submit these when your changes affect the building envelope, such as vapor barriers, moisture control systems, or insulation.

  • Contractor Information: Provide licensing and insurance documents for all trades performing work to prove proper certification and coverage.

  • Energy Efficiency Documentation: For renovations over $20,000 in value, include energy efficiency compliance documentation, possibly requiring an EnerGuide evaluation.

  • Secondary Suite Documentation: If your bathroom renovation is part of creating a legal secondary suite, provide permits and documents to meet zoning and egress rules.

  • 2025 Compliance Documentation: Submit additional documents for seismic compliance or adaptable dwelling modifications when required by the updated building code.


Permit Fees Understanding permit costs helps you budget and avoid surprises.


2025 Fee Structure

  • Basic Building Permit: $300 - $1,500, depending on project scope and complexity.

  • Plumbing Permit: $100 - $300, additional fee for fixture changes or new installations.

  • Electrical Permit: $150 - $250, required for new circuits or major electrical work.

  • Structural Permit: $200 - $400, additional cost for wall modifications or load-bearing changes.

Additional Cost Considerations

  • Standard Inspections: Included in initial permit costs; re-inspection fees apply if work fails initial review.

  • Strata Properties: Renovations in strata buildings may require additional strata approval fees ranging from $200 to $1,000 depending on building bylaws and project scope.

  • 2025 Compliance Upgrades: New seismic compliance or accessibility modifications can add $1,000 to $3,000, depending on required upgrades.

  • Professional Review Fees: Complex projects may require additional professional review fees.

    City of Vancouver online ePlan permit form for submitting a bathroom renovation building permit in 2025
    City of Vancouver's ePlan interface for submitting a 2025 bathroom renovation building permit application online, featuring steps for location, information, and document submission.

2025 Compliance Requirements

Vancouver updated building requirements effective March 10, 2025, to improve safety and accessibility in bathroom renovation projects.

Seismic Compliance Standards

You must meet enhanced earthquake safety standards for all load-bearing changes in bathrooms. This includes reinforcing walls, ceilings, and floors per Vancouver’s revised seismic code. Repairs and modifications now require detailed engineering review.

Adaptable Dwelling Requirements

Bathroom layout changes may require new accessibility standards, such as:

  • Installing grab bar supports

  • Adding barrier-free shower entry options

  • Widening doorways for accessibility

  • Providing clearance around new fixtures

Energy Efficiency Standards

For projects over $20,000, you must meet higher efficiency requirements, including low-flow fixtures, LED lighting, and improved ventilation. These support Vancouver’s environmental goals and reduce long-term costs. Learn more about renovation costs in Vancouver to help plan your project.

Digital Compliance Tracking

You must track all permit stages—from submission to final approval—through the ePlan portal. This digital system provides real-time updates and transparent communication.

Waterproofing Standards

New requirements for shower, bathtub, and wall waterproofing prevent water damage and mold. Inspectors verify specific materials and installation methods during inspections.


Inspection Requirements and Schedule

Bathroom renovations require multiple inspections to confirm compliance before occupancy; otherwise, you risk fines.

Required Inspection Stages

  • Rough-In Inspection: Schedule after framing, rough plumbing, and electrical work but before covering walls. Inspectors verify structure and utility rough-ins.

  • Plumbing Inspection: Schedule after rough-in installation but before connecting fixtures to water supply lines. Inspectors verify pipe installation, drainage, and venting.

  • Electrical Inspection: Schedule before energizing new circuits or outlets. Inspectors ensure electrical work meets safety standards and GFCI protection near water.

  • Waterproofing Inspection: New in 2025. Schedule before installing tile, stone, or other wall finishes in wet areas to prevent future water damage and mold.

  • Final Inspection: Schedule after all work is complete. You cannot occupy the bathroom until this inspection passes and the permit closes. Manage all inspections and permit applications through Vancouver’s online permit application portal.

Scheduling Process

Book inspections through Vancouver’s online system or by calling 311. Provide 48 hours’ notice. Missed inspections or covering work prematurely can cause fines, rework, or stop-work orders.

Coordinate with your contractor to ensure readiness before booking inspections.


Risks of Renovating Without Permits

Renovating without permits in Vancouver exposes you to serious financial and legal consequences, especially if you need a permit.

Fines

The city fines unpermitted bathroom renovations from $500 to $10,000 depending on severity and scope. Fines often exceed original permit costs.

Project Disruption

The city can issue stop-work orders and halt all renovation activity until you obtain proper permits. You may need to remove completed work that doesn’t meet code, adding costs and delays.

Insurance Complications

Home insurance claims may be denied if damage results from unpermitted or non-compliant renovations. This risk is high for bathroom work involving water and electrical systems.

Resale Complications

You must disclose unpermitted work during property sales. This can affect sale price and buyer financing. Buyers may require retroactive permits or work removal before purchase.

Safety Hazards

Non-compliant renovations, especially electrical or plumbing work, create serious hazards such as fire, flood, or mold risks that can harm occupants and neighbors.

Legal Liability

You remain liable for problems from unpermitted work even if contractors say permits aren’t needed. This liability extends to future occupants and can cause long-term legal exposure.

The costs and complications of unpermitted work far outweigh the investment in proper permits and inspections. Always verify permit requirements before starting.


Contact Information and Resources

Vancouver centralizes all bathroom renovation permit services through specific contacts and local regulations to simplify the process.

Development and Building Services Centre

Address: 515 West 10th Avenue, Ground FloorIn-Person Hours:

  • Monday, Wednesday, Friday: 8:30 am–4:30 pm

  • Tuesday, Thursday: 8:30 am–4:00 pm

  • Closed on holidays

Digital Resources

ePlan Portal: Submit and track all permit applications through Vancouver’s official ePlan portal. This system handles submissions, payments, and status updates.

Phone Support: Call 311 for general permit inquiries, application guidance, and inspection scheduling.

Professional Consultation

For complex projects or properties with special needs, schedule a pre-application consultation. Though not mandatory, it clarifies requirements and prevents costly delays.


FAQ


Do I need a permit to replace a toilet?You don’t need a permit if you replace a toilet in the same location. Moving the toilet or modifying plumbing requires a plumbing permit.

What if I want to move plumbing fixtures?You must get a plumbing permit and possibly a building permit if layout changes affect structure or building systems.

Can I do electrical work myself?You can do electrical work on your existing house, but you must get permits and inspections regardless of who does the work.

How long is a bathroom renovation permit valid?Standard bathroom renovation permits last 18 months from issue, giving you time to complete your project.

What if I start work before getting permits?Starting unpermitted work can lead to stop-work orders, fines, and undoing completed work. Always get permits first.

Do accessibility modifications need permits?Some accessibility retrofits need permits, especially if they involve structural, plumbing, or electrical changes. Contact Building Services for guidance.

Can permits be transferred if I sell my home?Permits are property-specific and don’t transfer between owners. New owners inherit ongoing permits but can’t transfer them to other properties.

How do I know if my existing house needs seismic upgrades?2025 requirements apply to new construction and renovations with load-bearing changes. Contact the city’s building department to check your situation.

What about tenant improvements in commercial spaces?Commercial bathroom renovations, including tenant improvements, follow similar permit rules but may have additional accessibility and commercial code requirements.

How can I avoid delays in the approval process?Submit complete applications with all documents, use professional drawings for complex work, and consider pre-application consultations.

Vancouver’s bathroom renovation permit requirements protect your project’s safety and investment. The 2025 changes bring digital and stricter standards. Whether minor updates or major renovations, start with the right permits and detailed plans to avoid costly issues.

For more information and to start your permit application, visit Vancouver’s official home property development website at https://vancouver.ca/home-property-development.aspx or contact the Development and Building Services Centre.


Need Help with Permits?

If navigating the bathroom renovation permit process in Vancouver feels overwhelming, Grand Renovations is here to help. Contact us for a compliant, hassle-free renovation experience. We’ll guide you through every step to ensure your project meets all local regulations and safety standards.


 
 
Grand Renovations Logo

At Grand Renovations, we proudly stand as a BBB Accredited renovation company, specializing in premium home renovations, remodeling, and improvements across Greater Vancouver and the Fraser Valley. From modern kitchen makeovers to luxury bathroom upgrades and full-home transformations, our expert team delivers craftsmanship, transparency, and peace of mind backed by the Better Business Bureau.

Our services include kitchen renovations with custom cabinetry, countertop upgrades, tile backsplashes, and appliance installations, as well as bathroom remodeling with walk-in showers, freestanding bathtubs, waterproofing, custom tiling, and steam shower systems. We also provide full-home renovations, flooring installation, basement finishing, lighting, and complete space transformations—always with the trust and accountability that come with our BBB accreditation.

Whether you’re upgrading a single room or planning a full-home renovation, choose a contractor recognized and trusted by the BBB. Contact Grand Renovations today for a free consultation and let’s create a home that reflects your style, built with quality you can count on.

ADDRESS

CONTACT US

OPENING HOURS

Mon - Sunday

24/7

SOCIAL MEDIA

  • Instagram Grand Renovations Vancouver
  • Facebook
  • Grand Renovations on X
bottom of page